Musanada implements road project in Al Wathba

Musanada implements road project in Al Wathba
Musanada implements road project in Al Wathba

Hello and welcome to the details of Musanada implements road project in Al Wathba and now with the details

Nevin Al Sukari - Abu Dhabi - Representational image.

Mohammed Alaa, Staff Reporter

The Abu Dhabi General Services Company (Musanada), in cooperation with the Municipality of Abu Dhabi City and strategic partners, is implementing a project in the south of Al Wathba to construct external roads and an infrastructure network.

The network, according to Musanada extends from the main road to four residential blocks, at a cost of Dhs314,250,000. It allegedly includes the provision of infrastructure requirements such as electric cables, sewage networks, storm water drainage networks, communication towers and gardens.

Musanada explained that the project will be completed within 21 months.

Musanada indicated that it is working with strategic partners to accelerate the pace of work to coincide with the project’s pre-set schedule, affirming its intention to develop an initiative to use artificial intelligence applications to support global best practices in projects management.

“Some initiatives related to artificial intelligence in connection with health and safety are applied in the road and infrastructure projects by providing equipment remotely controlled through the GPS through entering the coordinates of the drilling and filling sites without the need for the human element,” the company added.

Musanada pointed out that it emphasized the drivers of heavy vehicles working on the project site to ensure there are no obstacles surrounding the vehicle during work, stressing the need to provide an automatic mechanism to draw water from the tanks by opening and closing the water taps automatically without the need to get off the vehicle or the need for an employee to operate this mechanism.

Separately, the Abu Dhabi City Municipality has recently revealed the implementation of projects for internal roads, infrastructure and lighting in the Al Shamkha area, at a cost of Dhs295,528,354.

According to the Municipality, the projects include the construction of internal roads in “Basin 974/2-3” area at a cost of Dhs144,528,354. Also there is an infrastructure project for the basins SH30, SH31, SH32, SH34, SH33 at a cost of Dhs237 million, besides a lighting project at a cost of Dhs14 million.

These were the details of the news Musanada implements road project in Al Wathba for this day. We hope that we have succeeded by giving you the full details and information. To follow all our news, you can subscribe to the alerts system or to one of our different systems to provide you with all that is new.

It is also worth noting that the original news has been published and is available at Gulf Today and the editorial team at AlKhaleej Today has confirmed it and it has been modified, and it may have been completely transferred or quoted from it and you can read and follow this news from its main source.

PREV New UAE visa residency rules: all you need to know
NEXT 76% drop in pedestrian fatality in Dubai in 2007-2019: RTA